We’re finishing our new single, GOD IS GOOD, and preparing it for radio and streaming. Soon thousands here and around the world will hear the Gospel through this song — our mission is to preach through music and testimony.

So far faithful partners have donated $9,492 — 31% of our $30,000 goal. Every partner helps spread this message farther. Thank you for believing in the mission and helping us share Jesus.

A yellow rectangular sign with black text and arrows reading 'DONATE NOW', with a note below that says 'ALL GIFTS ARE TAX DEDUCTIBLE THROUGH BREAK THE GREY INC.' on a black background.
A promotional image for a cash app with a large gold dollar sign inside a black circle at the top, followed by the text 'CASH APP' in bold black letters, and the instruction 'SCAN TO GIVE WITH CASH APP'. Below, a QR code with a green dollar sign in the center.
A promotional flyer with a black and gold logo at the top, the word 'ZELLE' in bold letters, a subtitle that reads 'SCAN TO GIVE WITH ZELLE,' and a QR code below for giving via Zelle.
A white gift card with a black circle at the top containing a yellow envelope icon. Text reads 'MAIL YOUR GIFT' in bold black letters, and below it, 'BREAK THE GREY, INC. P.O. BOX 25597 FORT WAYNE, IN 46825'.

Thank you for your generous gifts.
Federal Tax ID 27-1503812.
Nonprofit filed by Winters/King Inc.
All donations are tax-deductible through Break the Grey, Inc.